OD3BIM Group

Tallaght, Dublin · Industrial & Manufacturing

Blenders Warehouse

≈150 tonnes of warehouse steel — a double-span portal frame with secondary portal, hot- and cold-rolled packages, and a late spiral stair absorbed without delay.

The completed Blenders Warehouse facility in Tallaght with two-tone cladding

Blenders Warehouse is a large-scale industrial facility built around a double-span portal frame with an adjoining secondary portal structure — approximately 150 tonnes of steel, detailed across both hot-rolled and cold-rolled packages with full cladding coordination.

The discipline in a job like this is the interfaces: hot-rolled to cold-rolled, structure to cladding rails, frame to connections. Each one was coordinated in the model so fabrication and installation stayed efficient at scale.

When a spiral staircase entered the scope late in the project, it was integrated into the existing model and detailed at pace — absorbed into the programme rather than becoming a delay to it.

Outcome

A fully coordinated detailing package that kept fabrication efficient and installation streamlined — including a spiral staircase added late in the programme.

The warehouse portal-frame steel model overlaid on the laser-scan point cloud of the site
The portal frames in the model, set against the site point cloud
Aerial view of the completed warehouse with rooftop solar arrays
The completed facility from above