NHS · Uxbridge, England · Healthcare
Hillingdon Hospital
A design-and-build steel package for the NHS at Hillingdon Hospital — large mid-project changes absorbed without moving the programme.

Hillingdon Hospital, delivered for the NHS in Uxbridge, is what design-and-build looks like when it goes well: a steel package modelled while the design was still moving.
The client made several significant changes between start and finish. Each one was assessed, sequenced and worked into the model without disturbing the programme — the deadlines set at the start were the deadlines met at the end.
Outcome
Every design change assessed and worked into the model efficiently — the client's deadlines never moved.